East Long. Pub. Schools Cap Plan History 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 East Longmeadow Public Schools 2004-2005 2004-2005 FS QT    2005-06 FS  2005-06 #  2006-07 FS  2006-07 2008-2009 FS 2008-2009 2009-2010 FS 2009-2010 2010-2011 FS 2010-2011 2011-2012 FS 2011-2012 2012-2013 FS 2012-2013
Meadow Brook Yearly Escalation %  (x17%)          (x21%)   orig.cost    (x25%)   orig.cost  (X33%)   orig.cost  (X33%)   orig.cost  (X33%)   orig.cost  (X33%)   orig.cost  (X33%)   orig.cost
Renovate North Parking Lot $41,919 Meadow Brook                                                    
Fire Doors wired into Fire Panel (fire dept) 3 elem                       $4,000 Q                          
Rebuild all unit ventilators                       $100,000 BF $112,500                        
        Fire Sprinkler Suppression System                               $130,250 A $104,200                    
        Integrated Telephone system                                           $185,000 B $148,000        
        Toilet Room Floor Drains & Hood Ansul System                                                 $26,600 A $20,000  
        New Addressable Fire Alarm System                         $125,020 B $94,000                          
        Clean all air ducts (ADA) (all 4 schools)                         $84,979 BQ                          
        Replace Kitchen Ceiling(health inspector cited)                         ???? BF                          
        Replace Folding Gym Partition Doors                         $36,850 Q                          
Mountain View Mountain View                                                    
Fire Doors wired into Fire Panel (fire dept) 3 elem                   $4,000 Q                          
ADA Restroom renovations (4 primary wing)       $48,000 ADA Classroom sinks                                     $34,580   $26,000              
        Update plumbing system & hot water to classrooms                                     $170,240 A $128,000              
        Replace Kitchen Ceiling $40,950 $35,000 AB                         $26,600 A 20,000                    
        Install Fire Suppression System in Kitchen                                                 $102,500 A $82,000  
        Replace Café, office Air Handling Units                                           $99,750 B $75,000        
        Clean all air ducts (ADA) (see quote under mbrook)                           B                            
Mapleshade                                                    
Fire Doors wired into Fire Panel (fire dept) 3 elem                   $3,000 Q                          
Parking Lot Lighting                 $30,000 Q                          
Renovate Heating adjuncts $10,000 Furniture Replacement $23,400 $20,000 Q                             $32,366 Q $24,336            
Electric Upgrades $15,000 Replace Café Air Handler                             $26,600 B $20,000                  
New Boiler System $80,000     Kitchen Toilets and Hood Ansul System                               $76,800 B $57,744                    
New Compressor System $5,000     Patch & Match Lobby Terrazo                 8   Q                                  
        Upgrade Fire Sprinkler Suppression System                               $109,874 A $80,200                    
        Rebuild Unit Ventilators                         $70,000 BF $95,000                          
        Clean all air ducts (ADA) (see quote under mbrook)                           B                            
Birchland Park Middle School                                                    
Air Conditioning for Café, Gym, Comm Rooms                       $218,000 Q                          
Update Academic Video System in Classrooms                             $59,200 Q $59,200                  
Update TV Studio Cameras (student use)                                   $44,900 Q $44,900            
High School                                                    
Renovate 9 rem. science rms  $60,000 $70,000 $60,000 $150,000   $180,000 Bring Egress Lights Up To Code (outside) $213,886 $182,000 D                   $105,000 BF                            
Sprinklers for fields                   $38,950 Q $38,950                        
Academic Video wiring/installation                       $75,625 Q $60,500                        
Replace Girl's restroom stalls $12,000 Asphalt Parking Lot front $93,600 $80,000   Q                     $97,344 Q                    
Science equipment/ microscopes       $22,600   Renovate HS hall Lockers                                           $235,011 B $176,700        
Asbestos removal boiler #2       $25,000   Replace Hall Fire Doors $76,050 $65,000 B                         $79,092 B                      
ADA Elevator for special needs in Auditorium       $17,000 Repair Lightning Protection System                                     $30,250 A $25,000              
Replace Burner for # 5 Boiler       $30,000 ADA Lift at Pool                                     $26,600 A $20,000              
        Renovate Water Basin Grates in P.Lot $37,440 $32,000 Q                         $38,937 Q                      
        Renovate Locker Room shower facilities                               $157,813 C $126,250                    
        Replace Gym Windows                         $42,350 A $35,000                          
        Replace Chalk/TackBoards For Classrooms                                                        
Renovation Band/Chorus Area back of HS                                   $266,000 Q $200,000            
        Replace 9X9 VAT tiles with VCT tiles in north wing                                     $208,012 B $156,400              
        Toilet stall partitions for faculty and students                               $36,120 A $28,000                    
        Replace cement asbestos fascia panels Gym/shop                                           $260,680 A $196,000        
        Replace Ceilings in Kitchen and Cafeteria                               $45,220 B $34,000                    
        Replace floor tiles in 1974 west wing                               $80,465 B $60,500                    
        Replace 12X12 Ceilings in Music, Art, Admin                                                 $116,100 B $90,000  
        Replace 12X12 ceilings in south and west classrms                                                 $113,050 B $85,000  
        Install complete fire suppression system (sprinkler)                               $509,257 C $382,900                    
New All-Season Track for ELHS                                   $450,000 Q              
New Artificial Turf Stadium Field for ELHS               14   C $175,000 $850,000 Q                          
        Replace pool water heater & hatch cover                                                 $97,000 C $63,000  
Replace HS Elevator with new code compliant one         16               $133,000 Q $100,000                        
Business/Technology Dept. Renovations                             $155,000 Q                    
Graphics Dept Equipment                             $50,685 Q                    
        Clean all air ducts (ADA) (see quote under mbrook)                           B                            
District Wide                                                    
Classroom Computers k-12 (year 3 of 3)                       $250,000                            
New Elem. Classrooms -12 units, (Year 3 of 10)                       $287,202     $287,202     $287,202     $287,202          
New bus fleet (trade in Year = $0 for year 1)               1   Q   ?????                            
Athletic Fields (all schools) Supplies (DPW Maint)                       $50,000                            
District Wide DDC Heating controls for 3 elem schools                       $140,000 BF                          
District Wide Technology/computers (3yrs) $364,250 $170,750 $158,250 Renovate HS outdoor basketball ct                             $33,250   $25,000                  
Pickup truck w/plow $27,000 Renovate HS south tennis court                             $24,200 Q $20,000                  
Special Education Mini Bus $30,000   TOTALS:   $485,326         $0       $0     $2,643,976     $2,023,909     $1,550,150     $1,067,643     $455,250    
  Legend:                                                  
Total District Requests granted by Town: $145,000 $503,169 $272,750 $365,850 $290,000 FS = Facilities Study pages A, B, C, etc. included The Capital Planning Committee agreed to fund                                                  
            * note:  Italics represent previously requested capital item. QT = Quotes included from a contractor. $50,000. annually for capital improvement projects                                                  
BF = Bruce Fenney, DPW Quote                                                    
            **shaded areas represent previous commitment from cap planning committee   * all prices average a 4% escalation factor ea year that cost under 20,000 each (4/2002).                                                  
            ***Bold areas represent needs that may be resolved by building committee AND capital planning committee recommendations * architect fees average 9% per project.                                                    
                Currently, the town cap.planning committee and school committee are discussing the possibility of doing all remaining 7 science rooms. All items capped at 33% escalation.